Testing

The testing phase is the phase when the SUT actual executes the interoperability or conformity assessment tests.

Manage persistent channels in the Gazelle Proxy

Submitted by abe on Wed, 03/01/2023 - 11:01

The Gazelle Proxy opens channels to capture the messages exchanged between two systems under test. In some cases, in particular when the receiver's role is played by a simulator, the Proxy shall open a channel and make sure it is up and running at any time. It means that the Gazelle Proxy shall automatically open such channels when it starts.

Verify conformance of messages and documents captured by the tool

Submitted by abe on Thu, 12/08/2022 - 16:47

During a peer-to-peer tests, SUT operators execute test cases to verify the interoperability of their solutions. At the same time, we want to ensure that the messages produced by each systems conform to the specifications the SUT claims to implement.

When the test bed captures the messages exchanged between the SUTs, it shall allow the SUT operator to verify their conformance.

A Gazelle user logs into the Communication tool using his Gazelle username and password

Submitted by abe on Mon, 12/05/2022 - 12:31

We are introducing a new feature to allow participants of a testing event to communicate fluently, using an external communication that is linked to Gazelle Test Management (management of channels for discussions).

Any user who is registered in a testing session as testing session manager, monitor, or SUT operator, shall be able to access the communication tool using his Gazelle credentials.

Gazelle users who do not participate in a testing session shall not have access to the communication tool. If they do have an account, it shall be inactivated.

SUT operator checks the conformance of the HTTP header of the message issued by his SUT

Submitted by abe on Fri, 11/18/2022 - 16:45

Prerequisite: 

A dedicated validation profile has been entered in the tool, that checks the requirements implemented by the SUT.

Description of the feature:

The SUT operator has a mean to verify the conformance of the HTTP header produced by his SUT against the implemented specifications. A test report is issued by the tool that gathers relevant information for the SUT operator to correct his SUT if needed:

Gazelle Test Management sends notification in the communication tool

Submitted by abe on Fri, 03/04/2022 - 09:40

During a test run, several actions are performed by the SUT operators and the monitors. If a test run channel exists, Gazelle Test Management shall post messages to inform the channel's members of the following events:

  • The status of the test run changes;
  • The status of a test step changes;
  • Someone posts a message in the chat window;
  • Someone adds an evidence in a test step or at the test run level.
  • A monitor claims the test
  • A monitor unclaim the test

TSM pushes information to the community

Submitted by abe on Thu, 03/03/2022 - 13:58

IHE Catalyst is creating an IHE Community with the support of Zoho Connect tool. The test session manager can take advantage of this tool to broadcast announcement to the community (or a group inside this community). Some announcement can be automatically triggered to the participants.

As a test session manager, I shall be able to announce to one or more groups that a test session is now open for registration;

When the registration deadline is reached, Gazelle Test Management shall trigger a notification to the groups that the registration is now closed;