Theme
Business phase
Answered user needs
Specification status
Draft
Implementation status
Planned
Description
During a test run, several actions are performed by the SUT operators and the monitors. If a test run channel exists, Gazelle Test Management shall post messages to inform the channel's members of the following events:
- The status of the test run changes;
- The status of a test step changes;
- Someone posts a message in the chat window;
- Someone adds an evidence in a test step or at the test run level.
- A monitor claims the test
- A monitor unclaim the test