Organisation Owner

A user who is responsible for managing the users who claim to be part of his organisation. He shall be allowed to:

  • Create account for users in his organisation
  • Block accounts of the users registered in his organisation;
  • Activate accounts of the users who claim to be part of his organisation

Enhanced notifications

Submitted by abe on Fri, 12/17/2021 - 12:29
Status
Draft
Customer
Renovation
Business owner
Anne-Gaëlle BERGE
Description

A lot of information are shared with the test event participant through the tool and they are available in various places. As a consequence, the participant has to regularly consult the various pages to check if a status changed or if a new information is available.

To inform the information in a timely manner, a notification system should be put in place.

 

What is/are the targeted context(s)?
Targetted goal(s)

Inform the participant in a timely manner of any useful information through an instant messaging system.

Expected benefit

Improve the user experience;

Save time to the participant, he does not have to look in the tool to find the information.

Documentation

As a SUT Operator, I want to be notified when the status of a test instance changes.

As a SUT Operator, I want to be notified when my SUT is accepted to the session.

As a SUT Operator, I want to be informed when my SUT is graded.

As a SUT Operator, I want to be notified when someone posts a message in the chat window of a test run in which I am involved.

As a SUT Operator, I want to be notified when a milestone is reached: registration starts, registration ends, session starts...

Dashboard for organisations

Submitted by abe on Thu, 12/16/2021 - 11:41
Status
Draft
Customer
Renovation
Business owner
Anne-Gaëlle BERGE
Description

Give information to the users about their current/previous participations to the testing events.

What is/are the targeted context(s)?
Who is the targeted audience?
Targetted goal(s)

Help participants to promote their attendance to test events and to have an overview of their past results.

Expected benefit

not sure there's any...

Documentation

Dashboard

  • Number of system registered per session + average
  • Number of participants per session + average per system + average per AIPO
  • Number of tested AIPO + results + drawings + average
  • Number of different partners (organisation level / SUT level)

Use a standardized language

Submitted by abe on Thu, 12/16/2021 - 11:25
Status
Draft
Customer
Renovation
Business owner
Anne-Gaëlle BERGE
Description

In Gazelle, the wording is not always consistent with ISTQB and it is really Connectathon oriented. It leads to confusion to Gazelle users. The wording shall be adapted in several places to improve the user experience.

What is/are the targeted context(s)?
Targetted goal(s)

Adapt the wording to the event supported by Gazelle TM.

Use a common language.

Expected benefit

Improve the user experience.

Opportunities

Sharazone, Inter-AMC and EPD projects will directly take advantage of this update.

Documentation

As a first action, we should make the current Connectathon menu agnostic of the type of test session:

  • Use the "type" (from the testing session configuration) as display name in the menu bar where "Connectathon" is currently used.
  • In case we do not merge the preparatory tests and test session tests:
    • The "Pre-Connectathon" sub menu might be renamed into "Preparatory tests"
    • The "Pre-Connectathon Tests" sub menu might be renamed into "List of preparatory tests"
    • The "Pre-connectathon results" sub menu shall be renamed into "Preparatory test results"
  • The "Connectathon" sub menu might be renamed into "Testing"
  • The "Connectathon" menu entry (lower level) could be renamed "Execute tests" (as well as the short cut in the top menu bar)
  • The "Connectathon result" menu entry should be renamed "Test session results"
  • The "Download connectathon report" menu entry should be renamed "Download test session report"

Then, everywhere in the tool, we should use the following vocabulary:

Current term New (English) New (French)
TF Interoperability model  
Tests list Tests Tests
Test definition Test cases Cas de tests
MetaTest List    
Configuration SUT Configurations Configurations des SUT
Network Network details Informations réseau
All configurations SUT network configurations Configurations réseau des SUT
Connectathon    
PreConnectathon Preparatory tests  
Test instance Test run  
Testing session Test session  
system SUT