Laboratory Manager

User responsible for a testing laboratory.

Use a standardized language

Submitted by abe on Thu, 12/16/2021 - 11:25
Status
Draft
Customer
Renovation
Business owner
Anne-Gaëlle BERGE
Description

In Gazelle, the wording is not always consistent with ISTQB and it is really Connectathon oriented. It leads to confusion to Gazelle users. The wording shall be adapted in several places to improve the user experience.

What is/are the targeted context(s)?
Targetted goal(s)

Adapt the wording to the event supported by Gazelle TM.

Use a common language.

Expected benefit

Improve the user experience.

Opportunities

Sharazone, Inter-AMC and EPD projects will directly take advantage of this update.

Documentation

As a first action, we should make the current Connectathon menu agnostic of the type of test session:

  • Use the "type" (from the testing session configuration) as display name in the menu bar where "Connectathon" is currently used.
  • In case we do not merge the preparatory tests and test session tests:
    • The "Pre-Connectathon" sub menu might be renamed into "Preparatory tests"
    • The "Pre-Connectathon Tests" sub menu might be renamed into "List of preparatory tests"
    • The "Pre-connectathon results" sub menu shall be renamed into "Preparatory test results"
  • The "Connectathon" sub menu might be renamed into "Testing"
  • The "Connectathon" menu entry (lower level) could be renamed "Execute tests" (as well as the short cut in the top menu bar)
  • The "Connectathon result" menu entry should be renamed "Test session results"
  • The "Download connectathon report" menu entry should be renamed "Download test session report"

Then, everywhere in the tool, we should use the following vocabulary:

Current term New (English) New (French)
TF Interoperability model  
Tests list Tests Tests
Test definition Test cases Cas de tests
MetaTest List    
Configuration SUT Configurations Configurations des SUT
Network Network details Informations réseau
All configurations SUT network configurations Configurations réseau des SUT
Connectathon    
PreConnectathon Preparatory tests  
Test instance Test run  
Testing session Test session  
system SUT  

 

Switch to another testing session

Submitted by abe on Wed, 07/28/2021 - 12:32
Description

Gazelle Test Management is designed to handle multiple testing sessions. It allows the registration, the execution, and the results to be specific to a testing session.
The user is able to change context by switching the testing session.

Specification status
To be reviewed
Status
Available
Priority
Essential - Must have, it is essential for the use cases
Is specific to a project ?
No
GUI sketch up (Image)

Customize the home page of the tool

Submitted by abe on Wed, 07/28/2021 - 12:32
Description

Edit the content of the home page

Specification status
To be reviewed
Status
Available
Priority
Medium - Feature to be considered
Is specific to a project ?
No