Test designer marks a test as "Grading required"

Implementation status
Planned
Targetted user
Description

We currently have two main categories of test cases: Preparatory tests are labelled "Pre-Connectathon tests" and the other test types are aimed to be executed during the test session "testing" phase.

The testing strategy has evolved, as well as the test tools. Moreover, we are merging the Pre-Connectathon and Connectathon test execution page into one "test execution and logs page". Logs for Pre-Connectathon tests are going to be collected in the same way as we do for Connectathon tests. In practive, there are Connectathon tests that can be run in advance to the event because they are preparatory steps and there is no real need for the monitor to grade them (usually the description tells the monitor to simply mark the test as verified).

In order to reorganise the test plan, make its execution more flexible by the operators and to fasten/reduce the workload of the monitors, the test designer shall be able to say that a test case has to be grading by a monitor. 

In the test summary section of the test, add a checkbox: Test runs shall be grading by a monitor. (Place it right below the "type" attribute).

Add an explanatory text: "If this option is not checked, the operator will be able to give himself a final status to the test runs".